Will it pass the compliance test?

Find out on my bench what the test lab will find on theirs, before you pay for the lab. For DC-powered and 24 V AC/DC industrial, marine and vehicle products heading for RCM or CE. Pre-scan and report AUD 3,500; with fixes and compliance folder AUD 6,500.

PricePre-scan and report AUD 3,500 · Pre-scan, fixes and compliance folder AUD 6,500
Turnaround1–2 weeks
Payment50% deposit
Next stepIntake form — I reply within one business day

Where you are

Your product is nearly done and it has to carry the RCM mark (or CE, or both) before it can be sold. The lab has quoted a day. Test labs commonly report that around half of the products they see fail the first time — Intertek’s long-quoted figure, and the lab data Henry Ott cites — and a failed run costs the lab day, a respin and a month you didn’t have; in my experience AUD 5,000–25,000. Most of those failures are visible on a bench a week earlier.

This is for DC-powered and 24 V AC/DC products: controllers, sensor nodes, motor drives, radios, meters — the kind that live in switchboards, engine spaces, dashboards and ceilings.

What it costs to find an EMC problem on a bench, against at the lab A pre-scan and report costs AUD 3,500 and a pre-scan with fixes and a compliance folder costs AUD 6,500. A failed lab run costs between AUD 5,000 and AUD 25,000 in a repeat lab day, a respin and about a month. Labs commonly report that around half of products fail the first run. The lab day itself is in neither figure, because it is paid on either path. labs commonly report about half of products fail the first run Pre-scan and report AUD 3,500 Pre-scan, fixes, folder AUD 6,500 AUD 5,000 – 25,000 A failed lab run repeat lab day · respin · about a month 0 5k 10k 15k 20k 25k AUD, on top of the lab day you pay on either path

Swipe the diagram sideways to see all of it.

Neither bar includes the lab day — you pay for that whichever way you go. What the pre-scan buys is the list of what would have failed, a week before the lab finds it for you. It is not a guarantee of a pass, and a bench is not a 3 metre chamber; it is the difference between walking in knowing and walking in hoping.

Two levels

Pre-scan and report Pre-scan, fixes and compliance folder
Conducted-emissions pre-scan (LISN and spectrum analyser) — this comes out close to lab numbers Yes Yes
Radiated pre-scan: near-field probes to find and rank what’s emitting [plus your antenna / TEM-cell setup if you have one] Yes Yes
Written report: what’s emitting, where from, an estimate of margin for conducted, a ranked list for radiated Yes Yes
Recommended fixes, ranked by cost Yes Yes
Implement fixes on your prototype (filtering, grounding, layout notes for the respin) and re-scan — Yes
Compliance-folder skeleton — what ACMA calls the compliance records: standards applied, test plan, Declaration of Conformity template, what the lab needs from you (a CE technical file too if you’re going that way) — Yes
Which lab, which standards, what to bring — Yes
Price AUD 3,500 AUD 6,500

A bench is not a 3-metre chamber. That’s why the report estimates margin and ranks fixes rather than promising a number, and why the second level exists: fix the things the bench can see, then walk into the lab knowing what to expect.

What I need from you

What’s not included

How it works

Intake form → scope and 50% deposit → units arrive → bench work → report (and, at the second level, fixes and folder) → 30-minute call → balance on delivery.